Friday 24 August 2001 - 9.40am |
||
![]() |
![]() |
|||
|
The four bolts for each vertical steel member are sunk into the concrete below a precise mark and centred. The resultant positioning was within 3mm of true. |
||
|
||||||||||||||||||
|
Friday 24 August 2001 The concrete footings are poured and spread evenly prior to the bolts being placed in exactly the correct position. |
||||||||||||||||||
![]() |
||||
|
Thursday 23 August 2001 Digging the footing begins after the site has been marked out. |
||||
![]() |
Tuesday 14 August 2001 evening Our leader, Paul, and Sandi celebrating the end of the second day's building - well, destruction anyway. At this rate all should be finished by the end of the week. On that thought a pig was seen flying overhead about the time this picture was taken. |
|||||||
![]() |
||||||||
![]() |
|||||
![]() |
|||||
|
"Hello Paul, it's Tommo. We've had the pond liner and the bright purple paint but there's no sign of Charlie Dymock." Congratulations to Janet Rooth at Universal Lung Ventilators for the caption above. |
|||||
![]() |
Monday 13 August 2001 Now you see it, now you don't. The case of the missing barn! These guys don't hang about. |
|||
![]() |
||||
![]() |
||||
|
Not exactly the first sod being turned but the site as it stood at 8am looking from the south-east about 100m from the site. |
||